Solar Thermal Power Generation for Trans Kalahari Corridor Development (2001)

This presentation prepared by Capital Sun Group, Industrial Solar Technology Corporation, Hamilton Mauer International and Kgalagadi Resources Development Company provides an overview of the Botswana Solar Thermal Electric Power Stations “B-STEP” which will put in place 500 kilowatt of solar thermal hybrid electric power station in Botswana.

The presentation gives information on the project objectives and timeline. The calls for project initiation were scheduled to start in 2001

Donwload document here or read it below


Botswana.pdf 740.5 Kb [396 download(s)]
Share/Save

By continuing to use the site, you agree to the use of cookies. Find out more by following this link. Accept