| |
|
S.O.L.I.D
- Singapore: World's largest Solar Cooling Plant in Commissioning Phase-
The solar thermal cooling plant at the United World College (UWC) in Singapore has now entered the commissioning phase. The system's collector surface covers an area of 3,900 m² and powers a 1,500 kW cooling unit, which is based on a single-effect lithium bromide absorption chiller. The United World Colleges are international schools with an emphasis on social and environmental issues. With 2,900 pupils, Singapore's UWC is the largest of the 13 colleges spread around the world.
Photo: S.O.L.I.D.
- Solar Cooling Market to experience big Changes-
According to Dr Uli Jakob, Vice President of the “Green Chiller - Association for Sorption Cooling”, the solar cooling sector may soon experience a shift from small series production of a niche market to considerable manufacturing quantities. Jakob points out two signs supporting such a development: First, the approval of the IEA-SHC task 48, “Quality Assurance and Support Measures for Solar Cooling“; second, the recent market entry of big players, such as Stiebel Eltron (Germany) and Hitachi (Japan).
Photo: Bärbel Epp
- Austria: Solar District Heating on the Rise in Graz-
On the 15th of May, the city of Graz saw the inauguration of another large-scale solar thermal installation (from left): Dr. Wolfgang Messner (Graz AG), Andrea Pavlovec-Meixner and Sonja Grabner (municipal councillors), Christian Holter (S.O.L.I.D) and Wolfgang Malik (Graz AG). Photo: Graz AG
- Lisbon: Solar cooling system for office complex-
Solar thermal installation on top of this huge banking complex in Lisbon: The Portuguese state bank Caixa Geral de Depositos (CGD) commissioned the Austrian engineering company S.O.L.I.D. to design the solar cooling plant.
Photo: S.O.L.I.D.
- Arizona: Solar Pre-heating for Sports Drinks-
It is one of the world's most efficient solar thermal installations: the solar thermal pre-heating system, which Gatorade, a subsidiary of the US-American soft drink producer PepsiCo, had installed this year in a factory in Arizona, US. The company responsible for designing the Arizonan installation was the Austrian manufacturer S.O.L.I.D. GmbH. “We are confident that the installation will reach a specific annual yield of 1,200 kWh/m2,” Harald Blazek from S.O.L.I.D GmbH's Project Development department announced.
|